Pre-Construction
Considered as part of construction project management, our overall planning, coordination, and control of a project from inception to completion aimed at meeting our client’s requirements.
Fast Screw Foundation System
Our no-mess system can be installed in a fraction of the time it takes to use more traditional forms, removing muck and unwanted soil from the site creating a unique solution to the stress and hassle of getting your project underway.
Off Site Construction
Our timber frames are constructed off-site in panel form. These panels are pre-made to the architect and engineer’s dimensions to be ready to install on-site as soon as the foundation system is in place. Our frames are structural, thermal, sustainable and eco – friendly.
Fast Solution Deployment
Traditional build time of standard small works such as a single story extension could take well over 6 months. The Eco Home Tec solution can be completed within 3 months, without the mess or on-site disruption.